+86-18826241798  |    +86 020 2262 6603  |    oversea@pearlelectric.com
Transformer Solution for Rail Transit Power System
Home » Solutions » Transformer Solution for Rail Transit Power System

Transformer Solution for Rail Transit Power System



The power supply system for urban rail transit consists of the entire power supply system that delivers electricity to the trains running on the urban rapid transit line through high-voltage transmission networks, step-down at main substations, distribution networks, and step-down and rectification (converted to direct current) at traction substations from the power system.


Core Equipment of the Rail Transit Power Supply System: Pearl Electrical is a professional manufacturer of rail transit power supply equipment. It can supply high-voltage transformers and main transformers for the high-voltage transmission networks and main substations of various rail transit power supply systems, provide distribution transformers for distribution networks, and provide traction transformers for traction substations.


Pearl Electric’s Rail Transit Supply Performance: Established for more than 60 years, Pearl Electrical has provided power transformers and distribution transformers for railways, subways, high-speed railways, and airports in various regions. Among them, the amorphous alloy dry-type transformer independently developed by Pearl Electrical is a high-performance and high-efficiency product. The following are some important achievements:


· Toshiba locomotive auxiliary power transformer

· China Railway Nanning Bureau Group Co., Ltd.

· Beijing Subway Regenerative Energy Feedback Project

· Guangzhou Urban Rail Transit Subway Project

· Beijing Railway Hub Fengtai Station Reconstruction Project

· Shenzhen Urban Rail Transit Line 6 Regenerative Energy Feedback Project

· Kunming Changshui Airport Tram Project

· CRRC Changchun High-speed EMU Maintenance Construction Project Phase I

· BYD Co., Ltd.

· CRRC Group (Tangshan Locomotive Factory)

· CRRC Group (Zhuzhou Converter Technology Research Institute)

· China Power Investment Corporation Jinchi Railway Project

· Guangzhou Underground Railway Company

· Yunnan Subway Maju Main SVG System Project

· Changsha Guangyi Tram Project

· Zhengzhou Subway Line 3 Regenerative Energy Feedback Project

· Lanzhou Subway Line 1 Regenerative Energy Feedback Project

· Chongqing Rail Transit Loop Line Phase I Regenerative Energy Feedback Project

· Chongqing Urban Rail Transit Lines 1, 3, and 9

· Shanghai Lingang Zhongyun Line 1

· Nansha Port New Railway Construction and Relocation Junan Town Jianfeng Project

· China Academy of Railway Sciences Rail Transit

· National Rail Passenger Car System Integration Engineering Technology Research Center Test Data Center Project



Contact Information

Tel: 0086 020 2262 6603
Mob: 0086 188 2624 1798
WhatsApp: 0086 188 2624 1798
Address: No. 220, Tanxin Road, Dagang Town, Nansha District, GuangZhou, China

Quick Links

Products Category

Keep In Touch With Us
Copyright  2024 Pearl Electric. All rights reserved.